Located close to Waterloo Station in Lambeth, this project involved the demolition and
replacement of a 1950’s Methodist Church and Mission which was no longer fit for purpose.
A new hotel comprising 137 guestrooms is currently under construction over 11 storeys along
with a new Methodist Church.
The project demonstrates a considered, contemporary design which is carefully detailed to
achieve an excellent BREEAM rating. Aros provided architectural and interior design
services through the detailed design and construction stages.
Location
Lambeth, London SE11
Sector
Mixed-Use
Year
2025
Awards
Brick Awards (Worldwide) - Shortlist
Core Team
Natasha Coutts
